Reginal Booking Platform (RBP)
We would like to draw the attention of all interested parties that Bulgartransgaz EAD concluded a contract for using a Reginal Booking Platform (RBP) which will be used at the entry/exit IPs with the neighbouring operators from EU Member states.
The implementation of the platform is compliant with the requirements of art. 27 Regulation (EU) No. 984/2013 establishing a Network Code on Capacity Allocation Mechanisms in Gas Transmission Systems and supplementing Regulation (EC) No. 715/2009 of the European Parliament of the Council (the Regulation). Following its implementation in normal operation, the Regional Booking Platform will be applicable to the following Bulgartransgaz EAD’s interconnection points:
IP Negru Voda 1/Kardam
IP Negru Voda 2,3/Kardam
IP Kulata/Sidirikastro
IP Ruse/Giurgiu
We would like to draw the attention of the existing and potential gas transmission networks users that booking and allocation of capacity at the above IPs will only be possible on the RBP, thus users should take the necessary steps to register. More information on the steps of the registration process is available at:
https://rbp.eu/network-user-registration
On 09.06.2016 a training on the use of the Regional Booking Platform shall be held in Bulgartransgaz EAD headquarters. All interested parties who intend to book capacity at the above-mentioned IPs may take part.
By 20 May 2016 all parties interested in taking part in the training should inform Bulgartransgaz EAD on the list of participants on their behalf and send the list to: info@bulgartransgaz.bg